Budget comparison by item (Budget console)
Check the comparison between the budget and the actual data registered based on the templates of the balance sheet, profit and loss statement, sales/management expenses report and cost report.
→To Operation Procedure
Screen Transition
[Basic Console Module]
↓
[Budget Console]
↓
[Budget Comparison by Item] or [Budget Comparison by Item 2] (B/S)/(P/L)/(Sales/Management Expenses)/(Cost Report)
↓
[Budget comparison by item] screen
Objects setup
[Searching Condition]
- Term
Specify the term for budget comparison by item.
- Template
Set the template code specified by the accounting department.
- Item
Select an item for comparison from [Department], [Correspondent], [Project Code 1], [Project Code 2], [Accounting Analysis Code 1], [Accounting Analysis Code 2] and [D Description].
Normally, select [Department] and enter the actual department or summary department.
- Budget Code
Enter the budget code specified by the accounting department.
- Row No.
The total number of rows in the spread is displayed.
-
Include Unapproved
To include unapproved budget in the budget comparison, check the box.
[Data Level]
-
1 - 20
Check the data level for budget comparison.
[Select Row]
- Summary Amount
Select between [All], [Achievement Rate] and [Difference]. When [Achievement Rate] or [Difference] is selected, enter the achievement rate or difference.
- Summary Period
Select between [PS Term Amt] and [Total Amt].
- Summary Unit
Select the summary unit to display the amount between [Summary A/C 1], [Summary A/C 2], [Summary A/C 3] and [A/C // Sub A/C].
- Row to Display
Specify the row number of the spread to select the specified row.
[Spread]
,![](img/minus.png)
Clicking
drills down the data to the details of [Summary A/C 1], [Summary A/C 2], [Summary A/C 3] and [A/C] for reference. The
changes into
when the data has been drilled down.
- Summary A/C 1 - 3
If [Summary A/C 1], [Summary A/C 2] or [Summary A/C 3] has been selected in [Summary Unit], the names of the summary A/C registered with the
[Financial
Statement module] are displayed.
- A/C Code, Sub A/C
If [A/C // Sub A/C] has been selected in [Summary Unit], the A/C name and sub A/C name are displayed.
- Budget Amt, Actual Amt
Shows the budget and actual amounts summarized based on the [Select Row] setting.
-
Difference
Shows the difference between the budget and actual amounts.
-
Achievement Rate
Shows the achievement rate of the actual amount to budget.
[Print]
-
Output All
All budget comparisons shown in the spread are output to Excel or printed.
[Buttons]
(Refer Term Balance update)
Shows in a separate window the condition of balance update for the term specified in [Term].
-
Refer
(Tracking)
Shows the data below the level displayed by drilldown with
and
in the [Tracking Console 3] screen.
- Excel output
Excel is started and a list is displayed containing only the budget comparisons selected in the spread. If the [Output All] box is checked, all of the budget comparisons in the spread are displayed in an Excel file. The data can be saved/ printed with Excel.
- Print
A list is displayed in the Print Preview window containing only the budget comparisons selected in the spread. If the [Output All] box is checked, all of the budget comparisons in the spread are displayed in an Excel file. The data can be printed with the Print Preview window.
(Graphics)
The rows selected in the spread are retrieved for graphical display of the budget comparison.
(Column Searching)
The [Column Searching] screen is displayed to allow column searching of the spared.
- Display Name 1 (Name1/2)
-
Clear
-
Exit